+387 33 279 100
-
REPLACE – Making heating and cooling for European consumers efficient, economically resilient, clean and climate-friendly
- April 17, 2020
- Posted by: enovaba_wpress
- Category:
No Comments
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
REPLACE – Challenge and mission The heating and cooling sector comprises 50% of final European energy consumption and over 68% of all gas imports. To reduce energy consumption and increase the share of renewables in this sector is therefore crucial for a successful Energy Union. In particular, the fact that 80 million out of 120 -
Increasing Investments in District Energy Systems in Cities – a SE4All Energy Efficiency Accelerator – Belgrade District Heating
- May 13, 2019
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
Serbia has been selected as one of the four pilot countries of the global GEF project “Increasing Investments in District Energy Systems in Cities – a SE4All Energy Efficiency Accelerator”. The main objective of the project is to provide analysis, training and support to the City of Belgrade and the Belgrade District Heating Company to -
Feasibility Study on expanding and improving the district heating system in the Canton of Sarajevo
- May 13, 2019
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The overall objective of the project is to support Bosnia and Herzegovina and the Canton of Sarajevo to take action on mitigating air pollution through promotion and utilization of renewable energy sources and improvements in access to district heating. The feasibility study for the Canton of Sarajevo district heating system addresses both the long-term strategy -
Study of Energy Consumption State in Main Health Centres in Canton Sarajevo With Calculation of Possible Energy Savings by Energy Efficiency Measures Implementation
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The overall goal is to strengthen the capacity for the implementation of energy efficiency measures and raise awareness by showing the benefits of improving energy efficiency in public buildings across the Canton. The aim was to demonstrate the technical and economic feasibility as well as numerous economic, environmental / ecological and social benefits of investment -
SEEERMAP Project: South East Europe Electricity Roadmap
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The South East Europe region (SEE) has significant renewable energy potential as well as the potential for balancing electricity via pumped storage which could be realised through additional investment and regional cooperation. This high potential is in contrast with the significant amount of investment currently planned in fossil fuel based electricity generation, in particular coal. -
Feasibility Study for HPP Babino Selo
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The Public Enterprise „Electric Utility of Bosnia and Herzegovina“ (EP BiH) is planning to construct a hydropower plant (HPP) on the Vrbas River in line with its strategy for efficient use of hydro resources and the development of new renewable energy capacities. The aim of the assignment is the development of a Feasibility Study, which includes -
Feasibility Study – South Interconnection of Gas Network (BiH and Croatia)
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The aim of the project was to conduct a study to examine and evaluate the options for the interconnection of the existing and planned natural gas systems of BiH and Croatia. Two potential routes were examined in order to establish which of these two options is the more viable and effective, Zagvozd (Croatia) via Posusje -
Feasibility Study for Heating Energy Supply of Area to/Including Sarajevo from TPP Kakanj
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The aim of the study is to assess whether and under what circumstances the supply of heat energy from TPP Kakanj to Sarajevo is justified. The assessment is carried out through analysis and evaluation of technological, economic and environmental aspects, taking into account institutional aspect and applicable legislation. Activities included: Analysis of the legal and -
Feasibility Study of the Thermal Energy Supply from TPP Kakanj of Area to/from Zenica
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
Within the Public Enterprise „Electric Utility of Bosnia and Herzegovina“ (EP BiH), more than 70% of produced electricity is based on coal in the power plants of Tuzla and Kakanj, while the remaining part of the electricity is produced by hydro-power. In order to fulfil its objectives with regard to emission reduction, EP BiH engaged the -
Green Economic Development – Increasing Energy Efficiency in Public Buildings in FBiH
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home1/enovaba/public_html/wp-includes/formatting.php on line 3479
The main objective of this project is to identify cost-effective measures for energy use and promotion of energy efficiency and savings in public buildings, and thereby reduce the cost of public budgets and harmful emissions into the atmosphere. Activities included (i) implementation of the detailed energy audits of selected public buildings (over 70 in total),
- 1
- 2