+387 33 279 100
Services
-
Country Biodiversity Analysis for Bosnia and Herzegovina
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
No CommentsEnova’s team carried out an assessment of the biological diversity in Bosnia and Herzegovina, which included: (i) Status of biological diversity in BiH; (ii) Description and status of major natural ecosystems; (iii) Description of current and potential threats to biodiversity; (iv) Description of the current policy frameworks in BiH; (v) Institutional capacities for nature protection; -
Corridor Vc – Klopce to Donja Gracanica and Svilaj to Odzak – Environmental & Social Assessment
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project was to carry out the environmental and social assessment of the following road sections along Corridor Vc (the Project): section Klopče – Donja Gračanica (5.78 km), section Odžak – Svilaj (10.40 km). Enova’s team of experts carried out the following tasks: E&S Assessment Report; Update of existing Environmental and Social -
Visoko Water Supply Project – Feasibility Study
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project was the development of an environmental and social assessment of a water utility company in the Municipality of Visoko as part of an overall feasibility study which EBRD will use to appraise the Project and take a decision on the prospective financing. The objective of the E&S assessment is to -
Zenica Bypass (Part of Corridor Vc 2) – Environmental and Social Assessment
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The Project includes the construction of the road section Entrance into Tunnel Zenica – Zenica North Interchange/Donja Gračanica in the length of 1.8 km of the Zenica Bypass which is part of the Corridor Vc. Enova was engaged by EBRD to carry out an Environmental and Social (E&S) Assessment of the Project and deliver an -
BiH Brcko District Municipal Project Feasibility Study
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The project goal was the preparation of a feasibility study for the rehabilitation and extension of the water and wastewater network of the Brcko District. Enova carried out an environmental and social assessment to identify and assess the potentially significant existing and future adverse environmental and social impacts associated with the Client’s current operations and -
Environmental impact assessment for Bihac bypass and Donji Vakuf bypass projects
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project is to undertake an Environmental Impact Assessment (including EIA, EMPA and WMP) for the following sections: Bihac bypass (total section length 9.67 km) Donji Vakuf bypass (total section length 3.50 km) Funded by: PC Roads of FBiH Sarajevo Country: Bosnia and Herzegovina Year: 2017 -
Feasibility study for construction of the waste water treatment plant (WWTP) for the leachate water from the Regional sanitary landfill “Moscanica”
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The objective of the project was the development of the feasibility study and the conceptual design for construction of the waste water treatment plant (WWTP) for the leachate water from the Regional sanitary landfill "Moscanica" in Zenica. The feasibility study includes an analysis of alternative technological solutions, as well as possibilities for the discharge of -
Management Plan for Protected Landscape “Konjuh”
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the Project was to develop a 10-year Management Plan for the Protected Landscape “Konjuh”. The Management Plan defines development guidelines, methods of protection, management and use of protected areas and the detailed guidelines for the protection and conservation of natural values of protected areas, respecting the needs of local people and stakeholders -
Long – Term Agreement to Conduct Specific Tasks Related to Architectural, Civil, Mechanical, Electrical, Geodetic, Geological, Traffic and Environmental Project Designs, Verifications and Supervision – Serbia
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
UNDP in Serbia implements projects and programmes within the scope of the Country Program Document 2016-2020 (CPD). Projects related to strengthening resilience of local communities require services of electrical, mechanical, geological, traffic and especially environment engineers. The framework contract awarded to the consortium encompasses the following activities on a variety of infrastructure projects over a -
Port of Brcko – Environmental and Social Assessment
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project was to carry out the environmental and social assessment of the “Port of Brčko” company with the aim of facility modernization and increase in cargo of the port. The Port is located in the north-eastern part of BiH, on the right side of the Sava River waterway, and is a