+387 33 279 100
Services
-
Feasibility Study for HPP Babino Selo
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
No CommentsThe Public Enterprise „Electric Utility of Bosnia and Herzegovina“ (EP BiH) is planning to construct a hydropower plant (HPP) on the Vrbas River in line with its strategy for efficient use of hydro resources and the development of new renewable energy capacities. The aim of the assignment is the development of a Feasibility Study, which includes -
Feasibility Study – South Interconnection of Gas Network (BiH and Croatia)
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project was to conduct a study to examine and evaluate the options for the interconnection of the existing and planned natural gas systems of BiH and Croatia. Two potential routes were examined in order to establish which of these two options is the more viable and effective, Zagvozd (Croatia) via Posusje -
Feasibility Study for Heating Energy Supply of Area to/Including Sarajevo from TPP Kakanj
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the study is to assess whether and under what circumstances the supply of heat energy from TPP Kakanj to Sarajevo is justified. The assessment is carried out through analysis and evaluation of technological, economic and environmental aspects, taking into account institutional aspect and applicable legislation. Activities included: Analysis of the legal and -
Feasibility Study of the Thermal Energy Supply from TPP Kakanj of Area to/from Zenica
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Within the Public Enterprise „Electric Utility of Bosnia and Herzegovina“ (EP BiH), more than 70% of produced electricity is based on coal in the power plants of Tuzla and Kakanj, while the remaining part of the electricity is produced by hydro-power. In order to fulfil its objectives with regard to emission reduction, EP BiH engaged the -
Green Economic Development – Increasing Energy Efficiency in Public Buildings in FBiH
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The main objective of this project is to identify cost-effective measures for energy use and promotion of energy efficiency and savings in public buildings, and thereby reduce the cost of public budgets and harmful emissions into the atmosphere. Activities included (i) implementation of the detailed energy audits of selected public buildings (over 70 in total), -
Feasibility Study for use of Solar Energy for obtaining Thermal and Electric Energy in the town of Bijeljina and Municipality of Bogatic
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
Bosnia and Herzegovina, primarily due to its geographical position, has a tremendous ability to use energy from the sun which is reflected in the fact that the potential of solar energy is five times greater than the total primary energy consumption. The country has so far failed to establish a mechanism that would result in -
Feasibility Studies for District Heating Systems in Bosnia and Herzegovina (Donji Vakuf, Gorazde, Gracanica, Jajce, Maglaj, Prijedor, Sanski Most, Sarajevo)
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The feasibility studies aim to assess the justification of supplying thermal energy through district heating systems, including biomass, in various cities in Bosnia and Herzegovina. The assessments are carried out through analysis and evaluation of technological, economic and environmental aspects, taking into account the institutional aspects and the applicable legislation. Funded by: Various Country: Bosnia and -
Independent Assessment in BiH in the Context of the Competitiveness Outlook 2018
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The aim of the project was to carry out an independent assessment for purposes of the publication series “Competitiveness in South East Europe: A Policy Outlook 2018” for 15 sectors in Bosnia and Herzegovina: Trade Policy and Facilitation, Investment Policy and Promotion, Education and Competences, Culture/Tourism, R&D and Innovation, Digital Society, Energy, Transport, Competition Policy, -
Sarajevo Water Project- Feasibility Study Update
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The overall objective of the project is to prepare an update of the original feasibility study for the Water Utility “Vodovod i kanalizacija“ Sarajevo and the Sarajevo Canton, which the EBRD can use to appraise the Project and take a decision on the prospective financing. Enova’s team performed the financial analysis and environmental and social -
Strengthen Bosnia and Herzegovina Decision-Making Towards Becoming a Party to the Minamata Convention and Build Capacity for Implementation of Future Provisions
- May 25, 2017
- Posted by: enovaba_wpress
- Category:
The main goal of the project was to support Bosnia and Herzegovina to undertake a Mercury Initial Assessment (MIA) to enable the country to determine the requirements and needs for becoming a Party to the Minamata Convention and to establish the foundations for undertaking future work towards the implementation of the Convention. The project consisted